MD-APS System
Intelligent Scheduling System
Intelligent Supply Chain Planning and Scheduling
Product Introduction
MD-APS Intelligent Scheduling System
A factory/workshop internal production scheduling module based on optimization calculations. The plan considers constraints of materials, manpower, machines, and methods, precise to hours, minutes, seconds, and each process and machine, outputs plans at the production order execution level, and tracks and provides early warnings for plan execution.
Core Functional Modules
Master Production Schedule
1.Formulates medium to long-term production plans based on orders, inventory, and capacity 2.Supports collaborative planning for multiple factories and workshops 3.Provides plan simulation and "what-if" analysis functions
Detailed Scheduling
1.Automatically generates detailed production operation plans 2.Considers resource constraints such as equipment, molds, and personnel 3.Supports finite capacity scheduling and infinite capacity scheduling
Resource Optimization
1.Equipment utilization optimization 2.Mold change and line change time minimization 3.Production bottleneck identification and mitigation
Plan Monitoring
1.Real-time tracking of plan execution status 2.Automatic early warning of plan deviations 3.Provides visual scheduling boards
Application Value
Intelligent Algorithms
Adopts advanced optimization technologies such as operations research and genetic algorithms
Real-time Response
Quickly responds to emergencies such as order changes and equipment failures
Visualization
Provides intuitive visualization tools such as Gantt charts and timelines
Configurability
Rules and parameters can be configured according to specific enterprise needs
Improvement Effects
Shorten the planning preparation time
Improve equipment utilization rate
Reduce work-in-progress inventory
Improve the on-time order delivery rate
Optimize the allocation of production resources
Service Commitment
Pre-sales Service Process
1.Demand research and proposal development. Conduct research to understand the company’s current status and future development strategy, clarify functional planning requirements for the factory, and develop targeted factory layout planning solutions.
2.Business negotiation and contract signing. Budget quotation + business negotiation confirmation; contract terms drafting + contract communication and signing.
3.Planning and project monitoring. Submit implementation results in stages: new plant planning functional division, large logistics flow design, production mode optimization, capacity design, warehouse configuration planning, etc. Conduct confirmation of planning results.
4.Implementation guidance and continuous follow-up. Provide guidance for the implementation of planning solutions and follow-up services.
01-Project Initiation
Project Scope
Project Organizational Structure
Project Technology
02-Requirements phase
Define user requirements
URS/RTM/RAM
Project plan
Validation plan
Deliverables list
03-Design phase
PS
DS(IDS/HDS/FDS)
Test plan and procedure
DQ
04-Implementation phase
Development environment
Test environment
Production environment
Implementation records
Issue tracking
Change and deviation handling
Internal testing
C&Q
05-Acceptance Phase
Operating Environment
System Import
User Training
Test Records
FAT(IQ)
SAT(OQ)
06-System Go-Live
Sign Off
System Handover
Document Delivery
Maintenance and Technical Support
Project Quality Assurance
Project Quality Control
Project Team Consultant Expertise Guarantee
After-sales Service Guarantee
Turnkey Project
24/7 After-sales Service
Additional Services