Digital Factory
By integrating and optimizing product development, production planning and production design, economic efficiency can be enhanced and the time for development, planning and commissioning can be shortened.
Digital Factory
3D Modeling and digital collaboration : Build precise 3D models for products to enable cross-departmental collaborative work.
Youdaoplaceholder0 Process simulation and virtual simulation : Simulate the layout of production lines and process flows, identify problems in advance and optimize them.
Youdaoplaceholder0 Data collection and interconnection : Real-time collection of equipment status, production progress and other data through the MES system to achieve information integration.
Youdaoplaceholder0 Industrial Internet and artificial intelligence : enabling interconnection and interoperability of devices, supporting intelligent quality inspection and fault prediction.
Service Commitment
Pre-sales Service Process
1.Demand research and proposal development. Conduct research to understand the company’s current status and future development strategy, clarify functional planning requirements for the factory, and develop targeted factory layout planning solutions.
2.Business negotiation and contract signing. Budget quotation + business negotiation confirmation; contract terms drafting + contract communication and signing.
3.Planning and project monitoring. Submit implementation results in stages: new plant planning functional division, large logistics flow design, production mode optimization, capacity design, warehouse configuration planning, etc. Conduct confirmation of planning results.
4.Implementation guidance and continuous follow-up. Provide guidance for the implementation of planning solutions and follow-up services.
01-Project Initiation
Project Scope
Project Organizational Structure
Project Technology
02-Requirements phase
Define user requirements
URS/RTM/RAM
Project plan
Validation plan
Deliverables list
03-Design phase
PS
DS(IDS/HDS/FDS)
Test plan and procedure
DQ
04-Implementation phase
Development environment
Test environment
Production environment
Implementation records
Issue tracking
Change and deviation handling
Internal testing
C&Q
05-Acceptance Phase
Operating Environment
System Import
User Training
Test Records
FAT(IQ)
SAT(OQ)
06-System Go-Live
Sign Off
System Handover
Document Delivery
Maintenance and Technical Support
Project Quality Assurance
Project Quality Control
Project Team Consultant Expertise Guarantee
After-sales Service Guarantee
Turnkey Project
24/7 After-sales Service
Additional Services